Smart Support Page
This area is a collection of tips, tricks, and fixes for
Smart
and
associated programs. You should only use the material on this page at
the direction of Smart support staff. Skorpion Pty Ltd takes no
responsibility for the results of any unauthorised use.
The Readme
page
gives a brief summary of
all significant changes in Smart. (There are hundreds of minor changes
which don't get listed.) It's a good place to find information about
new features which can make life easier for you.
Interim upgrades
These are upgrade builds which have not yet been
approved for
general release. They usually include minor changes and fixes which
have been requested by customers but not yet tested and accepted by
them.
- Do not install these builds unless instructed to do
so by
Smart support
- When running the upgrade, do not take the option
to upgrade the database unless instructed to do so by Smart support.
- Unless otherwise instructed, install the latest build
(the
one at
the top of the list).
Click on the link to proceed with the upgrade. You can
choose
the
option to Run from this
location
but choosing the Save
option
is more reliable. If you save to a location on your server you can
access the upgrade from other workstations on your network.
Smart 3.x
|
|
3.337.22
|
7 August 2006 |
Modified timer events to improve stability at
some installations. |
|
3.337.21
|
28 June 2006 |
Fix for problem with ADSW job creation |
|
3.337.20
|
20 June 2006 |
Revised ADSW job creation, no longer uses DDE.
Multiday job closeoff now allows multiple persons.
Revised Site History columns. |
|
3.337.19
|
12 June 2006 |
Fixed bug in monitoring interface window |
|
3.337.18
|
2 June 2006 |
Add MAS support |
|
3.337.17
|
1 June 2006 |
Tweak to SIMS Sync to coexist with MAS import.
Fix: Contractor job payment could be added to wrong invoice. |
|
3.337.16
|
22 May 2006 |
Fix: Site history showing job no instead of status
Change: Now logs when operator finishes creating a job and presses the
OK button, i.e. other operators can see job. |
|
3.337.15
|
16 May 2006 |
|
|
3.337.14
|
9 May 2006 |
|
|
3.337.12
|
8 May 2006 |
|
|
3.337.10
|
3 April 2006 |
|
|
3.336
|
20 Dec 2005 |
|
Smart 4.x
|
| 4.000.18 |
7 August 2006 |
First beta build with updated SmartNet |
|
4.000.17
|
20 June 2006 |
Revised ADSW job creation, no longer uses DDE.
Multiday job closeoff now allows multiple persons.
Revised Site History columns, added export to Excel.
Sped up loading of operator configuration items. |
|
4.000.16
|
12 June 2006 |
Fixed bug in monitoring interface window |
|
4.000.15
|
2 June 2006 |
Add changes to SIMS Sync; change to spell check |
|
4.000.14
|
31 May 2006 |
Mods to MAS Sync |
|
4.000.12
|
23 May 2006 |
Fixes to job print |
|
4.000.11
|
4 April 2006 |
|
|
4.000.10
|
3 April 2006 |
|
|
|
|
|
Scripts
The Smart database (Microsoft SQL Server or Oracle) is
fully
compatible with Structured Query Language (SQL). SQL is a flexible and
powerful way to extract information from your database or to update the
database
To run the scripts you require Query Analyser (the tool
that
ships
with Microsoft SQL Server) or a suitable third
party tool. (MS SQL also has a basic command-line tool,
OSQL.exe).
To request a script for your database please contact
Smart
Support, support@skorpion.com.au,
or 02 6628 2844
|